CAPEX Calculator
2-Ethylhexanol
Run what-if scenarios on total plant capital using the scale-factor (six-tenths) rule; split follows each reference case's ISBL/OSBL/Other/Working-capital ratios.
Step 1 · Process & Location
1 reference cases
Process (multi-select)
Location (multi-select)
Step 2 · Target Capacity & Assumptions
Target capacities (ktpa)
Total = Base Total × (Target / Base Capacity)^0.6
AI Insights
Updated 10/19/2026 · refreshed weekly
Summary
CCM Intel's CAPEX module records a 100 kt/y 2-Ethylhexanol (2-EH) plant on the US Gulf Coast using Davy and Dow LP Oxo technology, with a 2006 investment of USD 95.6 million. That equates to USD 0.956 million per kt of capacity, a 2006-vintage benchmark that is now 20 years old.
Key Highlights
›Total CAPEX: USD 95.6 million for the single reference project in the dataset.
›Capital intensity: USD 0.956 million per kt (about USD 956 per tonne of annual capacity).
›Scale: 100 kt/y nameplate capacity, a mid-sized world-scale oxo-alcohol unit.
›Technology and location: Davy and Dow LP Oxo (low-pressure oxo, rhodium-catalyzed hydroformylation) at USGC, which benefits from integrated propylene and syngas supply.
›Time series: The dataset has only one data point (2006), so no CAGR or year-on-year change can be derived. The figure should be treated as a nominal, historical reference rather than a current cost estimate.
Drivers & Risks
›Driver: USGC feedstock integration (propylene, syngas) and mature LP Oxo technology support relatively low capital intensity.
›Risk: Applying 2006 nominal costs to 2026 projects would likely understate today's costs, given engineering, equipment, and labor cost inflation since then.
›Risk: A single-project benchmark limits statistical robustness. Site-specific factors such as scope, battery limits, and the degree of integration may distort comparisons.
Scenarios
1
Lowest total capital
95.6USD mn
Highest total capital
95.6USD mn
Step 3 · Estimated Total Plant Capital
USD million, split by component
- ISBL
- OSBL
- Other Project Costs
- Working Capital
Scenario Results
USD million
| Process | Location | Base kt | Base yr | Target kt | ISBL | OSBL | Other Project Costs | Working Capital | Total | USD mn/kt |
|---|---|---|---|---|---|---|---|---|---|---|
| Davy and Dow LP Oxo | USGC | 100 | 2006 | 100 | 57.8 | 8.7 | 16.6 | 12.5 | 95.6 | 0.956 |
Methodology
How estimates are calculated
- Reference cases come from CCMIntel's capital cost database (ISBL, OSBL, Other Project Costs and Working Capital, USD million, cost basis year shown).
- Total plant capital is scaled with the capacity-exponent rule: Total × (Target ÷ Base capacity)^n, default n = 0.6.
- The scaled total is split using the original case's component ratios. Optional escalation brings costs from the base year to a target year.
- Estimates are indicative (±30%) and intended for screening, not for investment decisions.
Related Special Reports · Intermediate
2-Ethylehexanol Market Trends, Forecast and Opportunity Analysis – 2024 to 2030
Intermediate$2,700 USD≈ €2,405.03
Vinyl Chloride Monomer Market Trends, Forecast and Opportunity Analysis – 2024 to 2030
Intermediate$2,700 USD≈ €2,405.03
Trichloroethylene Market Trends, Forecast and Opportunity Analysis – 2024 to 2030
Intermediate$2,700 USD≈ €2,405.03
Styrene Market Trends, Forecast and Opportunity Analysis – 2024 to 2030
Intermediate$2,700 USD≈ €2,405.03